Management Platform Gateway

Scenario You want to calculate and integrate OPC data points with the Desigo CC gateway. This section includes instructions for integrating OPC data points in Desigo CC. For background information, see the reference section.

Prerequisites

 

Overview

1
2
3
4
5

Creating Scripts
Creating Virtual Data Points
Integration Subsystems 1
Integration Subsystem 2
Starting and Testing the Script