Installing and Configuring Advanced Reports for Trend Calculation
Scenario
You want to integrate Advanced Reports for Trend Calculation with the management platform, configure the reports, and schedule them to run automatically. For background information, see the reference section.
Prerequisites
- The extension Advanced Reporting is installed and added to the project.
- Advanced Reporting is configured, and the templates are synchronized.
- For viewing a report in Excel, Microsoft Excel 2007 or later is installed on your system.
- During automatic scheduling of reports to route the report to email, email settings are configured Configure Email Settings.
Overview
1 | Configure Trend Calculation Reports |