Link Parameters for InfoCenter
Properties of Links | ||
---|---|---|
Parameter | Label | Value |
P1 | Report Template | Name of the report template. |
P2 | Format | Output format of the report may be PDF, HTML, XLSX, DOCX. This is a required value. |
P3 | Template ID | Unique id allotted to report templates. TIP: This Id can be obtained by running the Template Information Report. |
P4 | Control Id 1 | Depending on the number of control present in the report template, enter the respective control Id’s. TIP: Control Id’s corresponding to a report template can be obtained from the Template Information table. NOTE: Enter the Control Id’s in the same order in which the control are added to the template. |
P5 | Control Id 2 | |
P6 | Control Id 3 | |
P7 | Control Id 4 | |
P8 | Control Id 5 | |
P9 | Additional Information | Mandatory Field. Specifies the type of data which is displayed in the report. Note: The format of Additional Information should be as mentioned in the above examples only The following are sample values for all reports, except for the Audit Trail Report:
Format for Audit Trail Report:
|
P10 | Query Param 1 Key | Value = ControlID6 This is explicitly provided for the AHU Report which has a 6th control. |
P11 | Query Param 1 value | The value of the AHU Report’s 6th control is entered here. |
P12 | (R) Data Range | The value can be any of the following and are case sensitive: - last week - last month - last quarter - last year - current week (for running the report for yesterday) - current month (for running the report for month-to-date) - current year (for running the report for year-to-date) NOTE: This field is required while executing reports through fixed links, otherwise it is not required. |
P13 | from time | The start time of the day from when you want the report data to be evaluated. The value must be entered in the following format: hh:mm:ss NOTE: This field is required while executing reports through fixed links, otherwise it is not required. |
P14 | to time | The end time of the day when you want the report data to be evaluated. The value must be entered in the following format: hh:mm:ss NOTE: This field is required while executing reports through fixed links, otherwise it is not required. |
P15 | fill down | The value for This value is either Y or N NOTE: This field is required while executing reports through fixed links, otherwise it is not required. |