Create a Link for the Report to be Executed

  1. In System Browser, select the view with the hierarchical structure of the building with floors, and managed meters installed on the floors.
  1. Select the building, floor, or managed meter for which you want to generate an energy report.
  • The list of reports associated with the selected building, floor, or meter displays in the Application Viewer tab.
  1. Select the report (for example, Consumption, Load Profile, or Max Power) that you want to schedule.
  1. Click Save As .
  1. In the Save As dialog box, enter the destination for saving the link.
  • The saved link displays in the Applications > Links folder.