Configure the Sankey Report
- You have selected the Sankey report type for configuration.
- The Report Definition configuration page displays.
- To configure the Sankey report perform any of the following steps:
- In the Source expander, click the Sync icon to synchronize the devices in the Powermanager node with the Sankey Tree node.
- In the Source expander, click on Create icon to add a new node to the Sankey tree.
- Enter the name of the root node in the Root Name field.
- Enter the root unit in the Unit field.
- Click New to add the required Measurement Point to the selected group/element in the Sankey tree.
- Enter values into the following columns:
a. Select the required measurement point from the drop-down list under the Measurement Point column.
b. Unit
c. Factor
d. Converted Unit - Click Save
.
NOTE: If the selected measurement point is not archived, a warning message will be displayed. You can save the report definition with warning. However, if the measurement points are not archived, the generated reports will not have any values. - The Save Object As dialog box displays.
- Enter a name and description and click OK.
- The Sankey report definition is configured.

You can create a new node within the Sankey tree after the use of the Sync function.