Migrate from SX Open to the Management Platform

Scenario

Integrating OPC data points without the existing Gateway SX Open. The current OPC Excel worksheet is required to process. For background information, see the reference section.

Prerequisites

  • The OPC DA Discovery and Scripts extension modules are installed and assigned to the project.
  • The following applies to all steps performed in Desigo CC:
  • System Manager is in Engineering mode.
  • The System Browser is in Management View.

Overview

1
2
3
4
5
6

Create Conversion File
OPC Integration
BACnet Integration
Create Virtual Data Points
Create Scripts
Create System Functions

To speed configuration, make sure the Desigo CC Transaction Mode is set to Simple or the Automatic Switch of Transaction Mode is set to True.
The automatic switch setting is recommended. Without it, to re-enable the logs, you need to set the Transaction Mode to Logging at the end of the configuration procedure.